Gareth's Robinhood 2B Site


MENU


The Donor
Stripping Donor
The Collection
The Build Diary
Links
Modifications
Hoodies
Home


ADVERTS



June
July
August
September
October

Latest News!

May - SVA Month (first attempt)
Bought
Watched
Planned
Completed
  • Mini Heater
  • Mini Wipers
  • preparing for SVA
  • almost all

April - Getting bad at this :(
Bought
Watched
Planned
Completed
  • Mig Welder
  • Video D
  • Front Wings
  • Front Head Lamps
  • Carpets
  • Seats
  • Windscreen
  • SVA form!
  • Indicators
  • Side repeaters
  • Mirrors
  • Boot
  • almost all

March 31st
Bought
Watched
Planned
Completed
  • Bonnet and nosecone
  • Rear Light Clusters
  • all

Mid - March
Bought
Watched
Planned
Completed
  • fancy sheet metal for heat protector
  • horn
  • knobs!
  • more fixings and trim
  • Video B
  • Video C
  • fixing passenger side panel
  • fixing passenger side wheel arch
  • fitting bonnet
  • loom and lights
  • dashboard
  • fusebox
  • all in part - one of those put it on, take it off, put it back on... months.

23rd February
Bought
Watched
Planned
Completed
  • nothing
  • Video B
  • Video C
  • fixing drivers side panel
  • fixing driver side wheel arch
  • all done

22nd February
Bought
Watched
Planned
Completed
  • exhaust gasket
  • none
  • fitting the exhaust.
  • fitting drivers side panel (loose)
  • bleeding of brakes
  • tidy up loom and lines
  • exhaust fitted
  • side panel on - no fixings
  • long story
  • some work done

18th February
Bought
Watched
Planned
Completed
  • nothing
  • none
  • starting the car!!! still
  • you betcha!

15th and 16th February
Bought
Watched
Planned
Completed
  • water hose
  • easi bleed
  • none
  • Front brakes
  • Loom into car (not fitted)
  • fluids
  • starting the car!!!
  • brakes fitted and bled
  • loom inot car
  • fluids done
  • nope :(

31st January
Bought
Watched
Planned
Completed
  • fuel pipe
  • brake pipes
  • brake unions
  • exhaust wrap
  • water hose
  • none
  • firewall
  • brake lines
  • fuel lines
  • electrics
  • rear brake lines
  • trial fitting of fuel lines
  • engine bay electrics

8th January - Happy New Year!
Bought
Watched
Planned
Completed
  • steel bar for fuel tank
  • Video A
  • Video C
  • Video B
  • Fitting steering column
  • Fitting pedals
  • Radiator
  • Fuel Tank
  • Rear ride height
  • all planned

27th December
Bought
Watched
Planned
Completed
  • 4.8 Blind Rivets
  • Rivet tool
  • Video A
  • Video C
  • Fitting rear back panel
  • Fitting tunnel sides
  • Fitting steering column
  • Fitting pedals
  • Completed Back Panel and tunnel sides

15th December
Bought
Watched
Planned
Completed
  • Clutch Kit
  • 8mm Pipe
  • M8 Long Bolts
  • Video A
  • Fitting Handbrake
  • Fitting Engine and Gearbox
  • Fitting Rear Panel
  • Completed all Planned


2nd December
Bought
Watched
Planned
Completed
  • Stainless Steel Nuts,bolts and washers from Screwfix direct
  • Video C (wishbone section)
  • Fitting of Wishbones
  • Fitted Wishbones

2nd November
Bought
Watched
Planned
Completed
  • Bacon & Bread
  • Video A (again)
  • Fitting Rear Axle
  • Fitted rear axle

31st October
Bought
Watched
Planned
Completed
  • Nothing
  • Video A (again)
  • Fitting Rear Axle
  • Fitting floor

30th October
Bought
Watched
Planned
Completed
  • Nothing
  • Nothing
  • Fitting Floor
  • Painting of chassis

Collection Weekend
Bought
Watched
Planned
Completed
  • Tyres
  • Tools
  • Videos A - C
  • Preliminary Build Order
  • Nothing


TOP